كود البرنامج : EU-13217
Overview:
Cost Estimating Basics
- The estimating life cycle
- Phases of the Design Process
- Programming phase
- Schematic design
- Design development
- Construction documents
- Estimating accuracy by phase
- Conceptual Cost Estimates
- Rough Order of Magnitude Estimates (Broad Scope Estimates)
- Assemblies cost estimates
- Cost indices
- Semi-detailed Estimates (Narrow Scope Estimates)
- Definitive Estimates (Detailed Scope Estimates)
- Basic procedures
- Lump-sum contracts
- Unit-price contracts
- Cost-plus contracts
- Cost-plus contract with guaranteed maximum price (GMP)
- Time-and-materials contracts
- Bid method
- Negotiated method
- Quantity take-off
- Types of construction contracts
- Procurement methods
- Pre-construction services
- Risk analysis and contingencies
Broad Scope Cost Estimating Techniques
- Adjustments to Project Cost for Broad Scope Estimates
- PERT Project Cost Analysis
- PERT Unit Cost Estimates
- Formulae for Cost Estimating
- The Normal Distribution Curve
- Z-Value Table
- The Probability of Project Completion within Budget
- Estimating Project Unit Cost by Using the Standard Deviation
- Estimating the Project Unit Cost at a Required Probability
- The Probability of Completing the Project at a Required Cost
- PERT vs. Standard Deviation & Z-Values
- Adjustments to Estimates Based on Previous Projects
- Adjustments for Time
- Review: Future Value of Money
- Review: Present Value of Money
- Equivalent Annual Interest Rate
- Index to Adjust for Time
- Equivalent Compound Interest
- Location Index for Construction
- Adjustments for Location
- Adjustments for Size
- Combined Adjustments
- Economic Price Adjustment
- Estimating Durations based on the Learning Curve Effect
- Estimating Costs based on the Learning Curve Effect
- Unit-Cost Adjustments
- Learning Curves
Budget Estimating Process
- Estimating by design phase
- Programming budget estimates
- Schematic design budget estimates
- Design development budget estimates
- Estimating pre-construction services
- Request for proposal
- Development of pre-construction services estimate
- Pre-construction services contract
- Budget control log
Bid Contract Estimating Process
- Pre-estimate activities
- Estimating process
- Solicitation of lump-sum bids
- Order-of-Magnitude estimates
- Work Breakdown Structure
- Estimating team
- Scheduling the estimating work
- Subcontractors and major suppliers
- Estimating forms
- Accuracy and error prevention
- Pricing self-performed work
- Recap sheet, Materials, Labour
- Applying pricing factors
- Summary recap
- Subcontractor work
- Project summary schedule
- Alternative techniques
- Elements of the general conditions estimate
- Final document review
- Completing the bid summary
- Final mark-ups
- Sales tax, Validating the estimate
- Estimating subcontractor work
- Estimating General Conditions
- Completing the estimate
Unit Price Estimates
- Unit price bid forms
- Direct cost estimation
- Materials
- Labour
- Indirect labour
- Subcontractors
- Recap summary sheet
- Direct-to-indirect cost factor
- Mark-up determination
- Variation-in-quantity contract provision
- Risk analysis
- Bid finalisation
Negotiated Contract Estimating
- Guaranteed Maximum Price Estimates
- Contract procurement process
- Documents
- Strategies
- Estimating process
- Contingencies
- Fee determination for negotiated contracts
- Reimbursable versus Non-reimbursable costs
- Home office overhead
- Risk evaluation
- Fee structure
- Cost savings split
- Strategies for responding to the Request for Proposal
- Documents to be included with the Request for Proposal
- General Contractor interview and selection process
- Negotiated subcontracts
- Cost proposals for negotiated contracts
Contract Types and Compensation Arrangements
- Risk distribution in contracting
- Project risk profiles
- Contract types according to risk distribution
- Fixed Price Contracts
- Firm Fixed Price
- Fixed Price with Economic Adjustment
- Incentive Contracts
- Fixed Price Incentive
- Cost Plus Incentive
- Cost Reimbursement
- Cost Plus Award Fee
- Cost Plus Fixed Fee
- Cost-Plus Contracts
- Time-and-Materials
Narrow Scope Cost Estimating Techniques
- Power-sizing techniques (Capacity Ratios)
- Factor estimates
- Cost estimating relationships (CER)
- Design-to-cost-estimates
- Target cost estimates
- Adjusting for Project Type and Quality Level
- Features Determining the Quality Level (Grade) of a Structure
- Adjusting for Quality Level by Using a Costing Publication
- Economic Constraints
- Parametric Cost Estimating
- Analysis of Estimating Accuracy
Framework for Applying Value Engineering in Projects
- What is Value Engineering? Why is it important?
- Defining Value Engineering concepts and principles
- Purpose of Value Engineering and Value Analysis
- Strengths and Weaknesses of Value Engineering
- How and When is Value Engineering applied?
- Project definition and initiation
- Project scope and charter development
- Life-cycle costing techniques
- Project stakeholders analysis and management
- Identifying relationships between Value, Cost and Worth
- Initiating Value Engineering Process
- Overview of Different Value Engineering Phases
- The Information Phase – steps and procedures
- Developing Value Engineering Job Plan
The Function Analysis Phase – Expressing Project Functional Needs and Constraints
- The need for Function Analysis in projects
- Defining project constraints – relationships and tradeoffs
- Conceptual project cost estimating techniques
- Function-Cost-Worth Analysis
- Developing FAST Diagrams to identify critical project components
- The Technical FAST Model to perform project value analysis
- Case Study
- Cross-Functional Project Team Approach
The Creative Phase – Inspiring Creativity in Your Project Team
- Creativity and Creative thinking within the project environment
- Individual vs. Group thinking to improve the quality of project decisions
- Creativity techniques as applied to optimize project value
- Blocks to creativity within the project team
- Brainstorm project solutions
- Reaching consensus and leveraging the power of project team collaboration
- Project risk perception and identification
- Project prioritization process using the Delphi technique
- The use of Force-field analysis in project problem solving
- Output of the Creative Phase
The Evaluation Phase -Making Informed Project Decisions
- Project ideas screening
- Project evaluation methods
- Quantitative evaluation using objective data
- Subjective evaluation – project-related criteria weighting
- Revisiting project life-cycle costing analysis
- Incorporating inflation in project economic analysis
- Performing project risk and scenario analyses
- Risk Life-cycle simulation modelling – best and worst project cost scenarios
- Pitfalls associated with the use of existing economic models
- Incremental benefit-cost analysis for project evaluation
- Effective Decision-making in project environment
- Output of the Evaluation Phase
The Planning and Reporting Phases -Getting Results through Effective Communication
- Develop and assess VE proposals to optimize project value
- Develop action plans and assign project roles and responsibilities
- Reporting VE findings to Senior Management and project stakeholders
- Mastering oral presentation techniques & interpersonal skills
- Strategies for project plan execution
- Incorporating VE into the early project phases
- Integrating VE with Continuous Improvement Techniques
- Wrap-up
Fundamentals of Strategic Planning
- What is strategy?
- Strategic management
- Strategic analysis
- Mission
- Objectives
- Strategic decision-making
- The strategic planning process
- Environmental analysis
- Resources analysis
- Strategic choice and strategic decision-making
- Strategic implementation
- Corporate objectives and accountability
- Forecasting financial data
Fundamentals of Financial Statements
- Financial statements
- Balance sheet
- Income statement
- Alternative asset valuation methods
- Cash flow statement
- Common size (or horizontal) trend analysis of financial statements
- Vertical trend analysis of financial statements
- Segmental analysis of financial statements
- Value added analysis of financial statements
- Understanding the cash flow cycle and the operating cycle
- Break-even and multiple product break-even analysis
Capital Structure and Leverage
- Sources of funds
- Capital cost models
- Cost of equity
- Cost of debt
- Weighted average cost of capital (WACC)
- Can we determine a company’s optimal capital structure?
- Capital structure models
- Preparing projections to determine financing needs
Capital Budgeting
- Future values, present values and DCF
- Capital budgeting principles
- Methods of evaluating capital investment projects
- Accounting rate of return (ARR) and payback
- Net present value (NPV) versus internal rate of return (IRR)
- How do you choose which method to use?
- Equivalent annual cost (EAC) method
- Capital budgeting methods
- Capital asset pricing model (CAPM) versus arbitrage pricing theory (APT)
- Does it make a difference whether we lease or buy?
Managing Financial Risks
- The value of perfect information (VOPI)
- Types of risk
- Risk management principles
- Talking to your bankers about managing risk
- How to develop the tools for your company?
- How to minimise risk?
- Insurance and hedging
- Interest rate and foreign currency exchange rate risk
The Challenge of Financial Economic Decision-Making
- The practice of financial economic analysis
- Corporate value and shareholder value
- A dynamic perspective of business Benchmarking your own strategic position/competitor analysis
- The agency problem and corporate governance
- What information and data to use?
- The nature of financial statements
- The context of financial analysis and decision-making
Assessment of Business Performance
- Ratio analysis and business performance
- Management’s point of view
- Owners’ point of view
- Lenders’ point of view
- Ratios as a system – pyramids of ratios
- Integration of financial performance analysis – the Dupont system
- Economic value added (EVA)
- Predicting financial distress
Projection of Financial Requirements
- Interrelationship of financial projections
- Operating budgets
- Standard costing and variance analysis
- Cash forecasts and cash budgets
- Sensitivity analysis
- Dynamics and growth of the business system
- Operating leverage
- Financial growth plans
- Financial modelling
Analysis of Investment Decisions
- Applying time-adjusted measures
- Net present value (NPV) and internal rate of return (IRR)
- Strategic perspective
- EVA and NPV
- Refinements of investment analysis
- Equivalent annual cost (EAC)
- Modified internal rate of return (MIRR)
- Sensitivity analysis, scenario analysis, simulation, and NPV break-even
- Dealing with risk and changing circumstances
Valuation and Business Performance
- Managing for shareholder value
- Shareholder value creation in perspective
- Evolution of value-based methodologies
- Creating value in restructuring and combinations
- Financial strategy in acquisitions
- Business valuation
- Business restructuring and reorganisations
- Management buy outs (MBOs) and management buy ins (MBIs)
مواعيد واماكن الإنعقاد
تاريخ الإنعقاد | مكان الإنعقاد | مدة البرنامج | التكلفة |
---|---|---|---|
2024-01-15 | باريس | -- | |
2024-01-15 | لندن | -- | |
2024-01-15 | روما | -- | |
2024-01-15 | دبي | -- | |
2024-01-15 | جدة | -- | |
2024-01-15 | نيويورك | -- | |
2024-01-15 | فلوريدا | -- | |
2024-01-15 | القاهرة | -- | |
2024-01-15 | اسطنبول | -- | |
2024-01-15 | أبو ظبي | -- | |
2024-01-15 | بيروت | -- | |
2024-01-15 | عمان | -- | |
2024-01-15 | كازابلانكا | -- | |
2024-01-15 | ألمانيا | -- | |
2024-01-15 | كوالالمبور | -- | |
2024-01-15 | مدريد | -- | |
2024-01-15 | شرم الشيخ | -- | |
2024-01-15 | جنيف | -- | |
2024-01-15 | بوسطن | -- | |
2024-01-15 | امستردام | -- | |
2024-01-15 | سنغافورا | -- | |
2024-01-15 | المنامة | -- | |
2024-01-15 | برشلونة | -- | |
2024-01-15 | واشنطن | -- | |
2024-01-15 | الدوحة | -- | |
2024-01-15 | الدمام | -- | |
2024-01-15 | الرياض | -- | |
2024-01-15 | الكويت | -- | |
2024-01-15 | مسقط | -- | |
2024-01-15 | بانكوك | -- | |
2024-01-15 | باريس | -- | |
2024-01-15 | لندن | -- | |
2024-01-15 | روما | -- | |
2024-01-15 | دبي | -- | |
2024-01-15 | جدة | -- | |
2024-01-15 | نيويورك | -- | |
2024-01-15 | فلوريدا | -- | |
2024-01-15 | القاهرة | -- | |
2024-01-15 | اسطنبول | -- | |
2024-01-15 | أبو ظبي | -- | |
2024-01-15 | بيروت | -- | |
2024-01-15 | عمان | -- | |
2024-01-15 | كازابلانكا | -- | |
2024-01-15 | ألمانيا | -- | |
2024-01-15 | كوالالمبور | -- | |
2024-01-15 | مدريد | -- | |
2024-01-15 | شرم الشيخ | -- | |
2024-01-15 | جنيف | -- | |
2024-01-15 | بوسطن | -- | |
2024-01-15 | امستردام | -- | |
2024-01-15 | سنغافورا | -- | |
2024-01-15 | المنامة | -- | |
2024-01-15 | برشلونة | -- | |
2024-01-15 | واشنطن | -- | |
2024-01-15 | الدوحة | -- | |
2024-01-15 | الدمام | -- | |
2024-01-15 | الرياض | -- | |
2024-01-15 | الكويت | -- | |
2024-01-15 | مسقط | -- | |
2024-01-15 | بانكوك | -- | |
2024-03-05 | باريس | -- | |
2024-03-05 | لندن | -- | |
2024-03-05 | روما | -- | |
2024-03-05 | دبي | -- | |
2024-03-05 | جدة | -- | |
2024-03-05 | نيويورك | -- | |
2024-03-05 | فلوريدا | -- | |
2024-03-05 | القاهرة | -- | |
2024-03-05 | اسطنبول | -- | |
2024-03-05 | أبو ظبي | -- | |
2024-03-05 | بيروت | -- | |
2024-03-05 | عمان | -- | |
2024-03-05 | كازابلانكا | -- | |
2024-03-05 | ألمانيا | -- | |
2024-03-05 | كوالالمبور | -- | |
2024-03-05 | مدريد | -- | |
2024-03-05 | شرم الشيخ | -- | |
2024-03-05 | جنيف | -- | |
2024-03-05 | بوسطن | -- | |
2024-03-05 | امستردام | -- | |
2024-03-05 | سنغافورا | -- | |
2024-03-05 | المنامة | -- | |
2024-03-05 | برشلونة | -- | |
2024-03-05 | واشنطن | -- | |
2024-03-05 | الدوحة | -- | |
2024-03-05 | الدمام | -- | |
2024-03-05 | الرياض | -- | |
2024-03-05 | الكويت | -- | |
2024-03-05 | مسقط | -- | |
2024-03-05 | بانكوك | -- | |
2024-03-19 | باريس | -- | |
2024-03-19 | لندن | -- | |
2024-03-19 | روما | -- | |
2024-03-19 | دبي | -- | |
2024-03-19 | جدة | -- | |
2024-03-19 | نيويورك | -- | |
2024-03-19 | فلوريدا | -- | |
2024-03-19 | القاهرة | -- | |
2024-03-19 | اسطنبول | -- | |
2024-03-19 | أبو ظبي | -- | |
2024-03-19 | بيروت | -- | |
2024-03-19 | عمان | -- | |
2024-03-19 | كازابلانكا | -- | |
2024-03-19 | ألمانيا | -- | |
2024-03-19 | كوالالمبور | -- | |
2024-03-19 | مدريد | -- | |
2024-03-19 | شرم الشيخ | -- | |
2024-03-19 | جنيف | -- | |
2024-03-19 | بوسطن | -- | |
2024-03-19 | امستردام | -- | |
2024-03-19 | سنغافورا | -- | |
2024-03-19 | المنامة | -- | |
2024-03-19 | برشلونة | -- | |
2024-03-19 | واشنطن | -- | |
2024-03-19 | الدوحة | -- | |
2024-03-19 | الدمام | -- | |
2024-03-19 | الرياض | -- | |
2024-03-19 | الكويت | -- | |
2024-03-19 | مسقط | -- | |
2024-03-19 | بانكوك | -- | |
2024-05-07 | باريس | -- | |
2024-05-07 | لندن | -- | |
2024-05-07 | روما | -- | |
2024-05-07 | دبي | -- | |
2024-05-07 | جدة | -- | |
2024-05-07 | نيويورك | -- | |
2024-05-07 | فلوريدا | -- | |
2024-05-07 | القاهرة | -- | |
2024-05-07 | اسطنبول | -- | |
2024-05-07 | أبو ظبي | -- | |
2024-05-07 | بيروت | -- | |
2024-05-07 | عمان | -- | |
2024-05-07 | كازابلانكا | -- | |
2024-05-07 | ألمانيا | -- | |
2024-05-07 | كوالالمبور | -- | |
2024-05-07 | مدريد | -- | |
2024-05-07 | شرم الشيخ | -- | |
2024-05-07 | جنيف | -- | |
2024-05-07 | بوسطن | -- | |
2024-05-07 | امستردام | -- | |
2024-05-07 | سنغافورا | -- | |
2024-05-07 | المنامة | -- | |
2024-05-07 | برشلونة | -- | |
2024-05-07 | واشنطن | -- | |
2024-05-07 | الدوحة | -- | |
2024-05-07 | الدمام | -- | |
2024-05-07 | الرياض | -- | |
2024-05-07 | الكويت | -- | |
2024-05-07 | مسقط | -- | |
2024-05-07 | بانكوك | -- | |
2024-05-14 | باريس | -- | |
2024-05-14 | لندن | -- | |
2024-05-14 | روما | -- | |
2024-05-14 | دبي | -- | |
2024-05-14 | جدة | -- | |
2024-05-14 | نيويورك | -- | |
2024-05-14 | فلوريدا | -- | |
2024-05-14 | القاهرة | -- | |
2024-05-14 | اسطنبول | -- | |
2024-05-14 | أبو ظبي | -- | |
2024-05-14 | بيروت | -- | |
2024-05-14 | عمان | -- | |
2024-05-14 | كازابلانكا | -- | |
2024-05-14 | ألمانيا | -- | |
2024-05-14 | كوالالمبور | -- | |
2024-05-14 | مدريد | -- | |
2024-05-14 | شرم الشيخ | -- | |
2024-05-14 | جنيف | -- | |
2024-05-14 | بوسطن | -- | |
2024-05-14 | امستردام | -- | |
2024-05-14 | سنغافورا | -- | |
2024-05-14 | المنامة | -- | |
2024-05-14 | برشلونة | -- | |
2024-05-14 | واشنطن | -- | |
2024-05-14 | الدوحة | -- | |
2024-05-14 | الدمام | -- | |
2024-05-14 | الرياض | -- | |
2024-05-14 | الكويت | -- | |
2024-05-14 | مسقط | -- | |
2024-05-14 | بانكوك | -- | |
2024-07-02 | باريس | -- | |
2024-07-02 | لندن | -- | |
2024-07-02 | روما | -- | |
2024-07-02 | دبي | -- | |
2024-07-02 | جدة | -- | |
2024-07-02 | نيويورك | -- | |
2024-07-02 | فلوريدا | -- | |
2024-07-02 | القاهرة | -- | |
2024-07-02 | اسطنبول | -- | |
2024-07-02 | أبو ظبي | -- | |
2024-07-02 | بيروت | -- | |
2024-07-02 | عمان | -- | |
2024-07-02 | كازابلانكا | -- | |
2024-07-02 | ألمانيا | -- | |
2024-07-02 | كوالالمبور | -- | |
2024-07-02 | مدريد | -- | |
2024-07-02 | شرم الشيخ | -- | |
2024-07-02 | جنيف | -- | |
2024-07-02 | بوسطن | -- | |
2024-07-02 | امستردام | -- | |
2024-07-02 | سنغافورا | -- | |
2024-07-02 | المنامة | -- | |
2024-07-02 | برشلونة | -- | |
2024-07-02 | واشنطن | -- | |
2024-07-02 | الدوحة | -- | |
2024-07-02 | الدمام | -- | |
2024-07-02 | الرياض | -- | |
2024-07-02 | الكويت | -- | |
2024-07-02 | مسقط | -- | |
2024-07-02 | بانكوك | -- | |
2024-07-16 | باريس | -- | |
2024-07-16 | لندن | -- | |
2024-07-16 | روما | -- | |
2024-07-16 | دبي | -- | |
2024-07-16 | جدة | -- | |
2024-07-16 | نيويورك | -- | |
2024-07-16 | فلوريدا | -- | |
2024-07-16 | القاهرة | -- | |
2024-07-16 | اسطنبول | -- | |
2024-07-16 | أبو ظبي | -- | |
2024-07-16 | بيروت | -- | |
2024-07-16 | عمان | -- | |
2024-07-16 | كازابلانكا | -- | |
2024-07-16 | ألمانيا | -- | |
2024-07-16 | كوالالمبور | -- | |
2024-07-16 | مدريد | -- | |
2024-07-16 | شرم الشيخ | -- | |
2024-07-16 | جنيف | -- | |
2024-07-16 | بوسطن | -- | |
2024-07-16 | امستردام | -- | |
2024-07-16 | سنغافورا | -- | |
2024-07-16 | المنامة | -- | |
2024-07-16 | برشلونة | -- | |
2024-07-16 | واشنطن | -- | |
2024-07-16 | الدوحة | -- | |
2024-07-16 | الدمام | -- | |
2024-07-16 | الرياض | -- | |
2024-07-16 | الكويت | -- | |
2024-07-16 | مسقط | -- | |
2024-07-16 | بانكوك | -- | |
2024-09-03 | باريس | -- | |
2024-09-03 | لندن | -- | |
2024-09-03 | روما | -- | |
2024-09-03 | دبي | -- | |
2024-09-03 | جدة | -- | |
2024-09-03 | نيويورك | -- | |
2024-09-03 | فلوريدا | -- | |
2024-09-03 | القاهرة | -- | |
2024-09-03 | اسطنبول | -- | |
2024-09-03 | أبو ظبي | -- | |
2024-09-03 | بيروت | -- | |
2024-09-03 | عمان | -- | |
2024-09-03 | كازابلانكا | -- | |
2024-09-03 | ألمانيا | -- | |
2024-09-03 | كوالالمبور | -- | |
2024-09-03 | مدريد | -- | |
2024-09-03 | شرم الشيخ | -- | |
2024-09-03 | جنيف | -- | |
2024-09-03 | بوسطن | -- | |
2024-09-03 | امستردام | -- | |
2024-09-03 | سنغافورا | -- | |
2024-09-03 | المنامة | -- | |
2024-09-03 | برشلونة | -- | |
2024-09-03 | واشنطن | -- | |
2024-09-03 | الدوحة | -- | |
2024-09-03 | الدمام | -- | |
2024-09-03 | الرياض | -- | |
2024-09-03 | الكويت | -- | |
2024-09-03 | مسقط | -- | |
2024-09-03 | بانكوك | -- | |
2024-09-17 | باريس | -- | |
2024-09-17 | لندن | -- | |
2024-09-17 | روما | -- | |
2024-09-17 | دبي | -- | |
2024-09-17 | جدة | -- | |
2024-09-17 | نيويورك | -- | |
2024-09-17 | فلوريدا | -- | |
2024-09-17 | القاهرة | -- | |
2024-09-17 | اسطنبول | -- | |
2024-09-17 | أبو ظبي | -- | |
2024-09-17 | بيروت | -- | |
2024-09-17 | عمان | -- | |
2024-09-17 | كازابلانكا | -- | |
2024-09-17 | ألمانيا | -- | |
2024-09-17 | كوالالمبور | -- | |
2024-09-17 | مدريد | -- | |
2024-09-17 | شرم الشيخ | -- | |
2024-09-17 | جنيف | -- | |
2024-09-17 | بوسطن | -- | |
2024-09-17 | امستردام | -- | |
2024-09-17 | سنغافورا | -- | |
2024-09-17 | المنامة | -- | |
2024-09-17 | برشلونة | -- | |
2024-09-17 | واشنطن | -- | |
2024-09-17 | الدوحة | -- | |
2024-09-17 | الدمام | -- | |
2024-09-17 | الرياض | -- | |
2024-09-17 | الكويت | -- | |
2024-09-17 | مسقط | -- | |
2024-09-17 | بانكوك | -- | |
2024-11-05 | باريس | -- | |
2024-11-05 | لندن | -- | |
2024-11-05 | روما | -- | |
2024-11-05 | دبي | -- | |
2024-11-05 | جدة | -- | |
2024-11-05 | نيويورك | -- | |
2024-11-05 | فلوريدا | -- | |
2024-11-05 | القاهرة | -- | |
2024-11-05 | اسطنبول | -- | |
2024-11-05 | أبو ظبي | -- | |
2024-11-05 | بيروت | -- | |
2024-11-05 | عمان | -- | |
2024-11-05 | كازابلانكا | -- | |
2024-11-05 | ألمانيا | -- | |
2024-11-05 | كوالالمبور | -- | |
2024-11-05 | مدريد | -- | |
2024-11-05 | شرم الشيخ | -- | |
2024-11-05 | جنيف | -- | |
2024-11-05 | بوسطن | -- | |
2024-11-05 | امستردام | -- | |
2024-11-05 | سنغافورا | -- | |
2024-11-05 | المنامة | -- | |
2024-11-05 | برشلونة | -- | |
2024-11-05 | واشنطن | -- | |
2024-11-05 | الدوحة | -- | |
2024-11-05 | الدمام | -- | |
2024-11-05 | الرياض | -- | |
2024-11-05 | الكويت | -- | |
2024-11-05 | مسقط | -- | |
2024-11-05 | بانكوك | -- | |
2024-11-19 | باريس | -- | |
2024-11-19 | لندن | -- | |
2024-11-19 | روما | -- | |
2024-11-19 | دبي | -- | |
2024-11-19 | جدة | -- | |
2024-11-19 | نيويورك | -- | |
2024-11-19 | فلوريدا | -- | |
2024-11-19 | القاهرة | -- | |
2024-11-19 | اسطنبول | -- | |
2024-11-19 | أبو ظبي | -- | |
2024-11-19 | بيروت | -- | |
2024-11-19 | عمان | -- | |
2024-11-19 | كازابلانكا | -- | |
2024-11-19 | ألمانيا | -- | |
2024-11-19 | كوالالمبور | -- | |
2024-11-19 | مدريد | -- | |
2024-11-19 | شرم الشيخ | -- | |
2024-11-19 | جنيف | -- | |
2024-11-19 | بوسطن | -- | |
2024-11-19 | امستردام | -- | |
2024-11-19 | سنغافورا | -- | |
2024-11-19 | المنامة | -- | |
2024-11-19 | برشلونة | -- | |
2024-11-19 | واشنطن | -- | |
2024-11-19 | الدوحة | -- | |
2024-11-19 | الدمام | -- | |
2024-11-19 | الرياض | -- | |
2024-11-19 | الكويت | -- | |
2024-11-19 | مسقط | -- | |
2024-11-19 | بانكوك | -- |